PROJECT RESOURCE · NO SIGNUP NEEDED
Before we draw: your pool project checklist.
Use this list to put your project brief together. You do not need every answer to start a conversation. We identify any missing inputs before drawing work begins.
1. The project
- Project city, state and permit office, if known.
- Residential or commercial use; new pool or renovation.
- Your role: owner, pool contractor, builder or designer.
2. The starting information
- Site plan or survey showing the property and proposed pool location.
- Sketch, dimensions, depths and preferred features.
- Existing drawings and permit review comments, if available.
- Equipment preferences and known site constraints.
3. The package you need
- Permit drawings, construction drawings, structural sheets, plumbing and hydraulic drawings or shop drawings.
- Whether your permit office asks for an engineer’s seal, and whether you already have an engineer.
- Your target date and project contact.
Ready to send it?
Send the list, or as much of it as you have, with your quote request. We reply by email within 24 hours. Residential drawing preparation takes 2 business days after we receive all project inputs. Where your permit needs an engineer’s seal, the engineer’s work takes additional time, and so does the permit office’s own review.