Skimmer pool and spa on a lakeside lot
Pool and spa plan with pile layout, sections and details, plumbing routing, electrical layout, spa and filtration schematics and fitting details. Sample, not for construction.
View all 7 sheets →The site plan shows your permit office where the pool sits on the lot. The barrier plan shows the fence, gates and other features that keep young children out. We draw both from your survey, pool layout and your permit office’s checklist.
DWG + PDF · Seal not included
Delivery time depends on the scope. Your quote states the delivery date.
Your contact: Benatic Paul Martin
JEBN Engineering LLC · benatic@jebnengineering.com
About JEBN Engineering LLC
Sheets from two drawing sets. Client and site names are removed and each sheet is marked VOID. Select a picture to see the sheet larger, then step through the set.
Pool and spa plan with pile layout, sections and details, plumbing routing, electrical layout, spa and filtration schematics and fitting details. Sample, not for construction.
View all 7 sheets →Site and demolition plan, layout, sections, elevations and 3D views, details, lighting and electrical, plumbing, equipment pad, hydraulic calculation, general notes and foundation details. Preliminary review set, unsigned and unsealed. Sample, not for construction.
View all 14 sheets →On a small lot both can fit on one sheet. Every item is drawn from information you or your pool builder supply and laid out to match your permit office’s list.
Request a full package or help with existing plans.
Get a quote for this set →Related: Pool permit drawings · Pool construction drawings · Owner-builder pool plans · Spa addition & remodel drawings
Property lines with their dimensions, the house, garage, sheds, decks and existing fences, taken from your survey or plat. Existing items and new work are drawn so a reviewer can tell them apart.
The pool and deck outline with dimensioned distances to each property line, to the house and to other structures. Your local rules set the minimum setbacks, and each distance is labeled so the reviewer can check it.
Recorded easements, overhead and underground power lines, and the well, septic tank, drain field and reserve area where your permit office asks for them. Some counties set minimum distances from wells and septic parts to the pool and deck.
Pump, filter and heater positions with distances to lot lines and structures. Where the 2024 International Swimming Pool and Spa Code (ISPSC) applies, equipment outside the barrier must be at least 36 inches from the outside of the barrier.
The barrier drawn around the pool area with its height and type, and each gate marked with its swing direction, self-closing and self-latching hardware and latch height. Notes cite the code section or state law your permit office names.
Doors and windows in house walls that open to the pool area, each marked with the protection you or your pool builder chose. Options can include alarms, self-closing and self-latching doors, or a safety cover, where your code or state law lists them.
A barrier plan involves several people, and each one has a separate job.
Ask about your project →Start with what you have. Your quote lists the sheets, the revisions included and the delivery date before you commit.
You do not need every document to request a quote. After the first reply, you can share files by email.
Open the project input checklist →We review your request and reply by email within 24 hours with questions or a scoped quote. We identify missing inputs and what your permit office asks for.
We draw the sheets listed in your quote from the design, details and measurements you send. Your quote states the delivery date.
You receive the PDF set for your permit submission and the DWG files. Your quote states the revisions included. Your permit office decides approval and timing.
JEBN prepares the drawings and does not seal them. Where your permit office requires an engineer’s seal, a Professional Engineer licensed in your state must direct the engineering and seal the set. The permit office decides approval. If it sends comments, send them to us. Your quote states the revisions included.
How the engineer’s seal works →A 3D view can help you explore the proposed layout and materials. Ask to include it as a separate item alongside the drawing package.
It depends on your permit office’s checklist. The checklists listed under Sources ask for items such as the property lines, the house and other structures, the pool and deck with distances to each lot line, easements and the equipment location. Some also want power lines, wells and septic systems. We draw the items your office lists, to scale and fully dimensioned, so a reviewer can check every distance.
The code and local rules your permit office enforces decide. Where the 2024 ISPSC is adopted, the top of the barrier must be at least 48 inches above grade, measured on the side away from the pool. California’s enclosure option calls for at least 60 inches. Florida’s law calls for at least 4 feet on the outside. Arizona’s statute calls for at least five feet, though some local ordinances apply there instead.
It depends on your permit office. Some ask for a survey of the property showing the pool location, and some want it signed and sealed by a professional surveyor. If your office accepts a plat or an existing site plan, we can draw from that instead. We do not survey the lot, so the distances on our plan come from the documents you send.
It can be, with conditions. Where the 2024 ISPSC applies, doors and operable windows with a sill under 48 inches that open to the pool need protection, such as UL 2017 alarms, an ASTM F1346 safety cover, or another approved means like self-closing, self-latching doors. Florida’s law allows a house wall with no door or window opening to the pool. California’s enclosure option must separate the pool from the home. The barrier plan marks each opening.
In some places it can. California asks new or remodeled pools at a single-family home to have two of seven listed features, and Florida asks for at least one of five. A safety cover and alarms are on both lists, but in California a safety cover and an in-pool alarm together do not count as the two features. Rules differ by state and city, so your permit office decides what counts at your address.
It depends on your state and permit office. The ISPSC says the code official must ask for documents prepared by a registered design professional where state law requires it, and some counties ask for sealed pool plans. Where your permit office requires a seal, a Professional Engineer licensed in your state, or an architect where your permit office accepts one, must direct the engineering and seal the set. JEBN does not seal drawings. You can use your own engineer or architect.
The statements on this page were checked against these official pages in November 2026. Codes, editions and local rules differ and change, so confirm what applies with your permit office. This page is general information, not legal advice.
JEBN Engineering LLC. We draft pool drawings for US permit submissions.
View state pages