Who seals pool drawings.
And what JEBN drafts.
Some permit offices ask for pool plans sealed by a Professional Engineer licensed in the state. This page explains who directs the engineering, who seals the set and what JEBN drafts. JEBN prepares the drawings and does not seal them.
- JEBN
- Drafts the drawings
- Engineer of record
- Directs and seals
- Permit office
- Decides approval
Rules differ by state. The official texts this page was checked against are listed under Sources.
Your contact: Benatic Paul Martin
JEBN Engineering LLC · benatic@jebnengineering.com
About JEBN Engineering LLC
Four parties, four jobs.
A sealed pool set has more than one author. Knowing who does what saves time and avoids paying twice.
Ask about your project →- Your permit officeApplies your state’s law and its building code. It tells you whether your pool needs sealed plans, and it reviews the set.
- The engineer of recordA Professional Engineer licensed in your state. Directs the engineering while the drawings are prepared, and seals the drawings and calculations.
- JEBNDrafts the drawing set to the engineer’s design, your builder’s details and the permit office’s checklist. JEBN does not seal drawings.
- You or your builderChoose the engineer and agree on the fee for the engineering with that engineer.
When a pool permit calls for an engineer.
Your state’s law and your permit office’s rules decide whether a pool needs sealed plans. Some permit offices list sealed plans among the documents for a pool permit. Where the ICC building or residential code is adopted, the building official may also ask for documents from a registered design professional when special conditions exist. These are situations to raise with your permit office before drawings start.
Ask about your project →- The checklist lists sealed plansThe pool submittal checklist asks for plans or structural calculations signed and sealed by an engineer licensed in your state.
- Close to a structure or slopeThe pool sits near a house footing, a retaining wall, a property-line wall or a slope.
- Difficult groundHigh groundwater, expansive clay, fill, or a soils report with design recommendations.
- Non-standard shellsRaised walls, vanishing edges, attached spas or a pool on a structure.
How the work runs when a seal is needed.
The engineer takes the project
An engineer licensed in your state agrees to be the engineer of record. Until then nobody can promise you a sealed set.
The engineer sets the design
Shell thickness, steel, the soil basis and the calculations come from the engineer.
JEBN drafts the set
We draw the plans, sections and details to that design and to your permit office’s checklist.
The engineer directs and seals
The engineer stays in charge of the engineering while we draw, marks changes as the work goes, and seals and signs the set.
Already have plans?
A seal certifies the work shown on the documents it is placed on. Plans sealed by an engineer licensed only in another state are generally not enough where your state requires a seal. If a different engineer adapts a sealed design to a new site, the NCEES model rules and California’s rules treat that as engineering the new engineer must take responsible charge of. Florida’s rules set similar steps for reusing another engineer’s sealed plans. Ask your permit office how it handles standard or repeat designs.
Where to go from here.
Pick the page that fits your project, or send your details for a quote.
Get my quote →- Drawings for your engineer of recordDrawing sets drafted to the design of the engineer who seals your project.
- Pool permit drawingsSite plan, pool plan, sections and details drawn to your permit office’s checklist.
- Owner-builder pool plansPermit drawings for homeowners who pull their own pool permit, drawn from your sketch or plans.
- Short answers by stateDo I need an engineer’s stamp? Arizona · Florida · Maryland · Michigan · New Jersey · Oregon · Pennsylvania · Tennessee · Washington.
Questions about seals and stamps.
Does JEBN seal or stamp pool drawings?
No. JEBN prepares the drawings. Where your permit office requires an engineer’s seal, a Professional Engineer licensed in your state must direct the engineering and seal the set.
Does every pool need an engineer?
Not everywhere. Your state’s law and your permit office’s rules decide. Some permit offices ask for sealed plans with every pool permit, and some ask only for certain pools. Ask your permit office for its pool submittal checklist before drawings start.
Who is the engineer of record?
The term is used for the Professional Engineer who is in charge of a project’s engineering documents and who signs and seals them. Not every state’s rules use the term. Where a seal is required, that engineer generally must hold a license in the state where the pool will be built.
Can I send finished drawings to an engineer for a stamp?
Not simply for a stamp. Engineering board rules in states such as California, Florida, Texas and Washington let an engineer seal only work the engineer did, or work done under the engineer’s responsible charge, which some states call direct supervision. The engineer has to be in charge of the engineering while the drawings are prepared. Some states let an engineer take over earlier work under set rules, so ask the engineer what applies in your state.
How do I find an engineer?
You can use an engineer you or your builder already work with. Your state’s engineering board can confirm that an engineer holds a license.
Who pays the engineer?
You or your builder, by agreement with the engineer. The engineer sets the fee for the engineering. Ask for it in writing before you commit.
Sources
The statements on this page were checked against these official texts in November 2026. Rules differ by state and change over time, so confirm them with your permit office and your state’s engineering board. This page is general information, not legal advice.
- NCEES Model Law, August 2025, section 110.10
- NCEES Model Rules, August 2025, sections 240.15 and 240.20
- California Professional Engineers Act, Business and Professions Code section 6735
- California Board Rules, 16 CCR 404.1
- Florida Statutes, section 471.033(1)(j)
- Florida Administrative Code, rule 61G15-18.011
- Florida Administrative Code, rule 61G15-27.001
- Texas Board of Professional Engineers and Land Surveyors, Acts and Rules, 22 TAC 137.33
- Revised Code of Washington, RCW 18.43.070
- Washington Administrative Code, WAC 196-25-070
- 2024 International Swimming Pool and Spa Code, Section 107.1
- 2024 International Residential Code, Section R106.1
- 2024 International Building Code, Section 107.1
- 2024 International Building Code, Section 202, definition of registered design professional
JEBN Engineering LLC. We draft pool drawings for US permit submissions.
View state pages