Skimmer pool and spa on a lakeside lot
Pool and spa plan with pile layout, sections and details, plumbing routing, electrical layout, spa and filtration schematics and fitting details. Sample, not for construction.
View all 7 sheets →In states such as Washington and South Carolina, a hotel, HOA or other public pool needs its plans reviewed and approved by a state or local agency before construction. Your engineer or architect of record sets the design. We draft the sheets the reviewer asks for from that design and the agency’s checklist, and deliver them as DWG and PDF files.
DWG + PDF · Seal not included
Delivery time depends on the scope. Your quote states the delivery date.
Your contact: Benatic Paul Martin
JEBN Engineering LLC · benatic@jebnengineering.com
About JEBN Engineering LLC
Sheets from two drawing sets. Client and site names are removed and each sheet is marked VOID. Select a picture to see the sheet larger, then step through the set.
Pool and spa plan with pile layout, sections and details, plumbing routing, electrical layout, spa and filtration schematics and fitting details. Sample, not for construction.
View all 7 sheets →Site and demolition plan, layout, sections, elevations and 3D views, details, lighting and electrical, plumbing, equipment pad, hydraulic calculation, general notes and foundation details. Preliminary review set, unsigned and unsealed. Sample, not for construction.
View all 14 sheets →Each agency sets its own list, so the sheet list follows your state’s rule and the reviewer’s checklist. This list of parts comes from the state rules and the CDC model code cited below.
Request a full package or help with existing plans.
Get a quote for this set →Related: Drawings for your engineer of record · Outsourced pool drafting · Rooftop & elevated pool drawings · Vanishing-edge pool drawings
The pool on the property, with nearby buildings, walkways, utilities and the equipment room. Some rules also ask for water, sewer and drainage locations on this sheet.
A dimensioned plan of each pool and cross sections through it. They show depths, the waterline, inlets, main drains, suction outlets, gutters or skimmers, stairs and ladders.
A flow diagram of pumps, filters, chemical feeders, heaters, surge tank, valves, gauges and flow meters. It also shows make-up water and backwash disposal, with pipe sizes taken from your engineer’s design.
The equipment room layout with space for installing and servicing each unit. Schedules list the pumps, filters, feeders and drain covers your engineer selected, drawn from the manufacturer’s data.
A data sheet with surface area, volume, flow rate, turnover time and bather load or peak occupancy. We enter these figures exactly as your engineer calculated them.
Deck paving, slope and drains, the enclosure, gates and latching hardware. Depth markings, signs, safety equipment and accessible entries appear where the rule lists them and your designer places them.
The drawings record decisions made by the people who are responsible for them.
Ask about your project →Send what you have now. Your free quote lists the sheets, the revisions included and the delivery date before you commit.
You do not need every document to request a quote. After the first reply, you can share files by email.
Open the project input checklist →We review your request and reply by email within 24 hours with questions or a scoped quote. We identify missing inputs and what the reviewing agency asks for.
We draw the sheets listed in your quote from the design, details and measurements you send. Your quote states the delivery date.
You receive the PDF set for your permit submission and the DWG files. Your quote states the revisions included. The reviewing agency decides approval and timing.
JEBN prepares the drawings and does not seal them. Where your permit office or the reviewing agency requires a seal, a Professional Engineer licensed in your state, or an architect where the rule allows one, must direct the engineering and seal the set. The reviewing agency decides approval. If it sends comments, send them to us. Your quote states the revisions included.
How the engineer’s seal works →A 3D view can help you explore the proposed layout and materials. Ask to include it as a separate item alongside the drawing package.
It depends on the state. In Washington, the state Department of Health or the local health officer reviews the permit application under WAC 246-260-021. In Iowa, the Department of Inspections, Appeals, and Licensing issues the construction permit for pools with more than 500 square feet of water surface. Florida law lets local governments review public pool plans against the Florida Building Code. Check your state’s rule, and ask your local building department whether a separate permit also applies.
It depends on the state, and several state rules require one. Washington asks for plans prepared, stamped and signed by an engineer or architect. Iowa’s rule 481 IAC 485.5(2) requires plans sealed by an engineer or architect licensed in Iowa. South Carolina law, section 44-55-2340, requires plans prepared and signed by an architect or engineer registered in the state. JEBN does not seal drawings, so the seal comes from your design professional.
Yes. We draft the set from your engineer’s design, calculations and mark-ups, and we redraw sheets when review comments come back. Where your permit office or health department requires a seal, a Professional Engineer licensed in your state, or an architect where the rule allows one, must direct the engineering and seal the set. JEBN does not seal drawings.
Each agency sets its own list. Washington’s and Iowa’s rules both ask for a site or overall plan, a scaled pool plan with cross sections, a piping schematic with pipe sizes and valves, an equipment layout and equipment specifications. Iowa also lists bathhouse drawings. Use your agency’s current checklist as the sheet list, and send it with your quote request so we can lay out the sheets to match the drawing items it lists.
The CDC’s Model Aquatic Health Code is voluntary guidance, not federal law. It becomes law only where a state, local, territorial or tribal jurisdiction adopts it, in whole or in part. New Mexico, for example, adopts the first edition by reference with its own changes. Where your jurisdiction uses it, we arrange the sheets around its plan submittal list, and your engineer applies its design requirements.
The federal Virginia Graeme Baker Pool and Spa Safety Act requires anti-entrapment drain protection at public pools and spas, including pools open only to hotel guests or to apartment or HOA residents. Where the 2010 ADA Standards apply, a pool needs at least two accessible entries, one a lift or sloped entry. Under 300 linear feet of wall, one lift or sloped entry can be enough. We draw both as your engineer places them.
The statements on this page were checked against these official pages in November 2026. Codes, editions and local rules differ and change, so confirm what applies with your permit office. This page is general information, not legal advice.
JEBN Engineering LLC. We draft pool drawings for US permit submissions.
View state pages