USA PROJECTSPool permit and construction drawings
USA / OWNER-BUILDER POOL PLANS

Owner-builder pool plans.
Drawn for the permit in your name.

You are pulling the pool permit in your own name, and the permit office still wants a clear drawing set. We draw the site plan, pool plan, sections, barrier and equipment sheets from your sketch, survey or kit maker’s plans, drawn to your permit office’s checklist. Files come as DWG and PDF.

DWG + PDF · Seal not included

JEBN
Drafts the set
File delivery
DWG + PDF
Engineer’s seal
Not included

Delivery time depends on the scope. Your quote states the delivery date.

Your contact: Benatic Paul Martin
JEBN Engineering LLC · benatic@jebnengineering.com
About JEBN Engineering LLC

SAMPLE DRAWINGS

Sample drawing sets.

Sheets from two drawing sets. Client and site names are removed and each sheet is marked VOID. Select a picture to see the sheet larger, then step through the set.

  • Longitudinal section through the spa and pool shell
  • Pool and spa plumbing routing plan with pipe runs in color
  • Isometric view of the pool equipment and pipework
POOL AND SPA SET · 7 SHEETS

Skimmer pool and spa on a lakeside lot

Pool and spa plan with pile layout, sections and details, plumbing routing, electrical layout, spa and filtration schematics and fitting details. Sample, not for construction.

View all 7 sheets →
Sheet list
  1. P-01 Pool and spa plan, pile layout
  2. P-02 Pool sections and details
  3. P-03 Pool and spa plumbing routing
  4. P-04 Pool electrical layout
  5. P-05 Spa plumbing schematic and isometric
  6. P-06 Pool plumbing and filtration schematic
  7. P-07 Pool fitting and fixing details
  • Layout plan of the two-tier fountain
  • Section through the fountain basins, walls and foundation
  • 3D view of the fountain on the entrance island

Project preview

Open full image in a new tab
YOUR DRAWING PACKAGE

What an owner-builder pool permit set shows.

Each permit office sets its own list, so the sheet list follows yours. An owner-builder set can cover these parts.

Request a full package or help with existing plans.

Get a quote for this set →
  1. Site plan

    The lot drawn to scale with property lines, setbacks, easements, the house and other structures, the pool, deck and equipment pad. Where your checklist asks for drainage, slopes, trees or septic locations, the site plan shows them too.

  2. Pool plan and depths

    The pool shape, length and width, steps and benches, with depths marked around the edge and wherever they change. The deck layout and dimensions in feet and inches sit on the same sheet.

  3. Sections through the pool

    Cuts through the walls and floor that show depths, slopes and the build-up of the shell. Steel, concrete or shell details are drawn from your engineer’s design, your builder’s standard details or the shell maker’s data.

  4. Barrier plan

    Where the fence, gates, house walls or other barrier sit around the pool, with gate swing and the barrier notes your local code calls for. The heights and gaps come from the rules your permit office enforces.

  5. Plumbing and equipment

    Skimmers, drains, returns and the pipe runs back to the pump, filter and heater, with the equipment pad layout. Pipe sizes and equipment models come from your pool builder, your engineer or your own choices. Manufacturer data sheets can go with the set when your permit office asks for them.

  6. Electrical and bonding notes

    The locations of pool lights, the pump, heater and equipment pad, with bonding notes taken from your electrician’s details or your permit office’s checklist. Some permit offices issue a separate electrical permit for this work.

WHO DOES WHAT

Who does what on an owner-builder pool project.

As an owner-builder you stand in the contractor’s place, so it helps to know where each task sits.

Ask about your project →
  • YouYou sign the permit application as the owner-builder and take responsibility for the work. You hire and supervise any trades, book the inspections and get failed work corrected and inspected again.
  • Your engineerWhere your permit office requires an engineer’s seal, a Professional Engineer licensed in your state must direct the engineering and seal the set. You can bring your own engineer to the project.
  • JEBNWe draw the permit set from what you send and revise the sheets when you, your engineer or the permit office mark changes. JEBN does not seal drawings or act as the engineer of record.
  • Your permit officeIt sets the checklist, asks for the owner-builder paperwork, reviews the set and sends comments. The permit office decides approval and carries out the inspections.
WHAT TO SEND

What to send for an owner-builder set.

Send what you have now, even if it is rough. Your quote lists the sheets, the revisions included and the delivery date before you commit.

You do not need every document to request a quote. After the first reply, you can share files by email.

Open the project input checklist →
  • Your lot informationA survey, plot plan or site plan of the property. If you have none yet, a measured sketch with the house, property lines and the pool location is enough to start the quote.
  • The pool you plan to buildYour sketch, a pool kit maker’s or shell manufacturer’s plans, or your engineer’s design, with the size, depths and where the equipment will go.
  • Your permit office’s checklistThe name of your permit office and its pool permit checklist or owner-builder handout. If you have already applied, add any review comments.
  • Equipment and barrier choicesPump, filter, heater and light models or their data sheets, and the fence, gates, alarms or cover you plan to use as the pool barrier.
FROM QUOTE TO DELIVERY

Three steps to your drawing set.

  1. Confirm the scope

    We review your request and reply by email within 24 hours with questions or a scoped quote. We identify missing inputs and what your permit office asks for.

  2. Draft the set

    We draw the sheets listed in your quote from the design, details and measurements you send. Your quote states the delivery date.

  3. Deliver

    You receive the PDF set for your permit submission and the DWG files. Your quote states the revisions included. Your permit office decides approval and timing.

Who seals the drawings

JEBN prepares the drawings and does not seal them. Where your permit office requires an engineer’s seal, a Professional Engineer licensed in your state must direct the engineering and seal the set. The permit office decides approval. If it sends comments, send them to us. Your quote states the revisions included.

How the engineer’s seal works →
Optional: 3D pool visualization

A 3D view can help you explore the proposed layout and materials. Ask to include it as a separate item alongside the drawing package.

BEFORE YOU ASK

Owner-builder pool permit questions.

Can I pull my own pool permit as a homeowner?

In some states, yes. The rules come from your state and your permit office. Florida’s statute has the owner sign the permit application in person and sign a disclosure statement before the permit is issued. Arizona’s exemption covers work for the owner’s own occupancy, not for sale or rent. California’s contractor board lists more than one owner-builder exemption. One covers owners who do the work themselves, or through their own employees, on a structure on their property that is not intended for sale. Another covers a homeowner improving their main home and has several conditions, including that the owner has lived there for the 12 months before the work is completed.

What drawings does a pool permit need?

Each permit office sets its own list. The published checklists listed under Sources ask for items such as a site plan drawn to scale with setbacks, a pool plan with dimensions and depths, sections, barrier details and equipment information. Some also ask for drainage or grading details, flood zone notes and separate electrical or plumbing permits. Send us your permit office’s checklist and we lay out the sheets to match the drawing items it lists.

Do owner-builder pool plans need an engineer’s stamp?

Sometimes. In Florida, Hillsborough County asks for pool plans signed and sealed by a Florida architect or engineer, and Orange County asks for in-ground pool plans from a Florida engineer or architect. Other places differ. Where your permit office requires a seal, a Professional Engineer licensed in your state, or an architect where your permit office accepts one, must direct the engineering and seal the set. JEBN does not seal drawings. You can use your own engineer or architect.

Can you draw from my sketch or a pool kit maker’s plans?

Yes. We draw from a hand sketch, a survey, existing plans, or a kit maker’s or shell manufacturer’s standard plans and installation data. Some permit offices work with standard pool plans or the maker’s installation instructions, and some still want site-specific plans, so ask yours first. Where your permit office accepts the maker’s plans, we draw the site-specific sheets that go with them: your lot, where the pool sits, the barrier and the equipment.

What happens if the permit office sends comments?

A plan reviewer may hold the permit and send a list of corrections. Send us the list. We revise the sheets and can mark where each item was answered, which some permit offices ask for when you resubmit. Your quote lists the revisions included. Comments about the engineering go to your engineer, and the permit office decides approval once it reviews the corrected set.

What else can the permit office ask an owner-builder for?

Beyond drawings, offices may ask for an owner-builder disclosure or exemption statement, a copy of your ID or a notarized signature, and a form naming who installs the barrier. Some want health department sign-off for a home on a private well and septic system, a recorded notice of commencement or a signed statement on draining pool water. Some also issue separate electrical, plumbing or gas permits. Read your office’s checklist.

JEBN Engineering LLC. We draft pool drawings for US permit submissions.

View state pages