Skimmer pool and spa on a lakeside lot
Pool and spa plan with pile layout, sections and details, plumbing routing, electrical layout, spa and filtration schematics and fitting details. Sample, not for construction.
View all 7 sheets →A vanishing-edge pool, also called a negative-edge or infinity-edge pool, needs more drawings than a standard pool. The set shows the weir wall, the catch basin below it, the edge piping and the water levels. We draw it from your engineer’s design or your pool builder’s details, as DWG and PDF files.
DWG + PDF · Seal not included
Delivery time depends on the scope. Your quote states the delivery date.
Your contact: Benatic Paul Martin
JEBN Engineering LLC · benatic@jebnengineering.com
About JEBN Engineering LLC
Sheets from two drawing sets. Client and site names are removed and each sheet is marked VOID. Select a picture to see the sheet larger, then step through the set.
Pool and spa plan with pile layout, sections and details, plumbing routing, electrical layout, spa and filtration schematics and fitting details. Sample, not for construction.
View all 7 sheets →Site and demolition plan, layout, sections, elevations and 3D views, details, lighting and electrical, plumbing, equipment pad, hydraulic calculation, general notes and foundation details. Preliminary review set, unsigned and unsealed. Sample, not for construction.
View all 14 sheets →Each sheet follows the decisions your engineer or pool builder has already made. The set puts those decisions on paper so the permit office can review them and the crew can build from them.
Request a full package or help with existing plans.
Get a quote for this set →Related: Pool structural drawings · Plumbing & hydraulic drawings · Rooftop & elevated pool drawings · Spa addition & remodel drawings
The weir wall is drawn in plan and section with its length, its top elevation and the spill face below it. Wall thickness, steel and footing are drawn from your engineer’s design or your pool builder’s standard details.
The lower basin is drawn with its length, width, depth, water levels and access points, at the capacity your engineer or pool builder has set. The plan shows where the basin sits against the slope, the deck and the pool wall.
The plumbing schematic shows the edge loop on its own: basin suction outlets, edge pump, return lines to the pool, valves and auto-fill, beside the main filtration loop. Where the 2024 International Swimming Pool and Spa Code (ISPSC) is adopted, Section 316.2 calls for either a surface skimming system or a perimeter overflow system on a permanent inground residential pool. The schematic shows which one your pool uses.
Sections cut through the pool wall, weir and basin show the ground behind them and the water levels at rest and running, all from one datum with the deck and coping.
Large-scale details show the waterproofing line across the weir top, down the spill face and inside the basin, with the tile, edge cap and the turn into the coping. They are drawn from the manufacturer’s data and your pool builder’s details.
The pad plan places the edge pump next to the filtration equipment, with pipe runs, valves and the pipe and pump sizes your engineer or pool builder selected. Each pump is labeled with the loop it serves.
On this kind of pool the design decisions and the drawing work sit with different people. The set should make that plain.
Ask about your project →You can start with a sketch and a site plan, and the quote is free. The more of the edge design you can send, the fewer questions come back.
You do not need every document to request a quote. After the first reply, you can share files by email.
Open the project input checklist →We review your request and reply by email within 24 hours with questions or a scoped quote. We identify missing inputs and what your permit office asks for.
We draw the sheets listed in your quote from the design, details and measurements you send. Your quote states the delivery date.
You receive the PDF set for your permit submission and the DWG files. Your quote states the revisions included. Your permit office decides approval and timing.
JEBN prepares the drawings and does not seal them. Where your permit office requires an engineer’s seal, a Professional Engineer licensed in your state must direct the engineering and seal the set. The permit office decides approval. If it sends comments, send them to us. Your quote states the revisions included.
How the engineer’s seal works →A 3D view can help you explore the proposed layout and materials. Ask to include it as a separate item alongside the drawing package.
A vanishing-edge set adds the weir wall in plan and section, the catch basin with its water levels, sections cut through the edge, and a plumbing schematic that shows the edge circulation as its own loop. A set can also include waterproofing and tile details at the spill face and an equipment layout with the edge pump. Your quote lists the sheets, the revisions included and the delivery date before you commit.
Your engineer or your pool builder decides the basin capacity. JEBN does not size the basin. We draw it at the size they give us. Where the 2024 ISPSC is adopted, Section 316.4.1 sets a minimum surge capacity where perimeter surface skimming systems are used. Your engineer and your permit office decide whether and how that applies to your edge.
It depends on your state and your permit office. Where the 2024 ISPSC is adopted, Section 107.1 has the code official require documents prepared by a registered design professional where state law calls for one. Where your permit office requires an engineer’s seal, a Professional Engineer licensed in your state must direct the engineering and seal the set. JEBN does not seal drawings. You can use your own engineer.
Yes. Send the sketches, calculations or mark-ups and we draw the weir wall, the basin walls and the steel as your engineer shows them. If a dimension or level is missing, or two sketches disagree, we send you the question instead of filling the gap ourselves. Your engineer stays in charge of the design and can send mark-ups at any stage. We update the sheets to match, within the revisions in your quote.
Yes. We draw the spill face, the weir top, the edge cap or coping, the tile layout at the edge and the waterproofing line, at a scale the trades can work from. The details follow your pool builder’s standard details and the manufacturer’s data for the tile, membrane and edge materials. You get DWG and PDF files, so the trades can take dimensions from the native drawing.
The 2024 ISPSC defines a vanishing edge, or negative edge, as water flowing over a pool wall into a catch basin. Where that code is adopted, Section 801.2 says a permanent inground pool at a home must meet Chapter 3, including the barrier rules in Section 305 and suction entrapment avoidance in Section 311. Federal rules at 16 CFR part 1450 also cover pool and spa drain covers. Check your state and local code.
The statements on this page were checked against these official pages in November 2026. Codes, editions and local rules differ and change, so confirm what applies with your permit office. This page is general information, not legal advice.
JEBN Engineering LLC. We draft pool drawings for US permit submissions.
View state pages