Skimmer pool and spa on a lakeside lot
Pool and spa plan with pile layout, sections and details, plumbing routing, electrical layout, spa and filtration schematics and fitting details. Sample, not for construction.
View all 7 sheets →Adding a spa or reworking an old pool starts with a drawing of what is in the ground. We draw the existing pool from your measurements, then show the new work, what comes out and how it connects to the plumbing and equipment you keep. You get DWG and PDF files for your permit office.
DWG + PDF · Seal not included
Delivery time depends on the scope. Your quote states the delivery date.
Your contact: Benatic Paul Martin
JEBN Engineering LLC · benatic@jebnengineering.com
About JEBN Engineering LLC
Sheets from two drawing sets. Client and site names are removed and each sheet is marked VOID. Select a picture to see the sheet larger, then step through the set.
Pool and spa plan with pile layout, sections and details, plumbing routing, electrical layout, spa and filtration schematics and fitting details. Sample, not for construction.
View all 7 sheets →Site and demolition plan, layout, sections, elevations and 3D views, details, lighting and electrical, plumbing, equipment pad, hydraulic calculation, general notes and foundation details. Preliminary review set, unsigned and unsealed. Sample, not for construction.
View all 14 sheets →A remodel set shows two pools on the same sheets: the one there today and the one after the work. Every sheet marks what is existing and what is new, so the plan reviewer and the crew can tell them apart.
Request a full package or help with existing plans.
Get a quote for this set →Related: Pool construction drawings · Plumbing & hydraulic drawings · Site plan and barrier plan · Owner-builder pool plans
The pool as it stands, drawn from your field measurements, photos and any old plans. Outline, depths, steps, benches, fittings and the equipment pad are shown, with anything not yet confirmed marked for site verification.
The added spa, new steps or benches, a changed wall or a new finish, dimensioned from fixed points on the existing pool. New work is drawn with its own line weight and hatch so it stands apart from what stays.
Which parts of the shell, coping, tile, deck and piping are removed, cut back or kept, as your pool builder sets out. Notes flag what is to be protected and what is to be checked once the old surface is open.
Where new spa or pool lines join the existing suction, return and equipment piping, with valves and any new equipment your pool builder has chosen shown on the pad. Suction outlets and their covers are shown too, so your pool builder and permit office can see what stays and what is replaced.
Where the permit office asks, the site plan adds the spa, new deck, equipment and distances to property lines, plus the fences, gates and house doors that form the barrier. Some offices inspect an existing fence or wall for code compliance before they close out the pool permit.
Sections and details through the spa shell, raised walls or new steps. We draw the structure as your engineer or pool builder designed it, from their sketches, details and mark-ups.
Several people work on a remodel, and each one owns a different part of it.
Ask about your project →Send what you know about the pool today and what you want to change. The quote is free. Your quote lists the sheets, the revisions included and the delivery date before you commit.
You do not need every document to request a quote. After the first reply, you can share files by email.
Open the project input checklist →We review your request and reply by email within 24 hours with questions or a scoped quote. We identify missing inputs and what your permit office asks for.
We draw the sheets listed in your quote from the design, details and measurements you send. Your quote states the delivery date.
You receive the PDF set for your permit submission and the DWG files. Your quote states the revisions included. Your permit office decides approval and timing.
JEBN prepares the drawings and does not seal them. Where your permit office requires an engineer’s seal, a Professional Engineer licensed in your state must direct the engineering and seal the set. The permit office decides approval. If it sends comments, send them to us. Your quote states the revisions included.
How the engineer’s seal works →A 3D view can help you explore the proposed layout and materials. Ask to include it as a separate item alongside the drawing package.
It depends on your permit office. Some permit offices count a spa or hot tub as a pool, and some require permits to alter or repair an existing pool, not only to build a new one. Oakland, California, for example, says altering or repairing a pool needs planning review and building permits, and its pool definition includes hot tubs and spas. Ask your permit office what applies at your address.
Yes. We draw the as-built plan from your field measurements and use the photos to read them correctly. Photos alone cannot give reliable sizes or depths, so we need measured numbers for the outline, depths, steps and fitting locations. Anything that cannot be measured is marked on the drawing for your pool builder to verify on site.
Then the existing pool is drawn only from what can be measured and seen. Hidden items, such as shell thickness, steel and buried pipe routes, are noted on the set as unknown or to be verified when the work opens them up. Your pool builder or engineer decides how to handle what is found, and we revise the drawings to match.
It can, and your permit office decides. Pleasanton, California says any permit to remodel a pool or spa at a single-family home requires at least two of seven listed drowning prevention features. Oakland has a similar rule for private pools. In Phoenix, altering an existing pool barrier needs a new permit, and when an addition or remodel changes any part of the barrier, the new work must meet the city’s adopted barrier code. Check with your own permit office.
Where your permit office requires an engineer’s seal, a Professional Engineer licensed in your state must direct the engineering and seal the set. JEBN does not seal drawings. Some offices ask for sealed pool engineering with a pool permit, Boulder County, Colorado among them. You can use your own engineer, and we draw the set from that engineer’s design and mark-ups.
Partly. The Virginia Graeme Baker Pool and Spa Safety Act sets a standard for pool and spa drain covers made, distributed or sold in the United States. Its rules for anti-entrapment equipment on pools in use apply to public pools and spas, which include pools at hotels, member clubs and multi-family housing. They do not apply to a private backyard spa. State and local codes set their own rules for private pools, so ask your permit office what applies to yours.
The statements on this page were checked against these official pages in November 2026. Codes, editions and local rules differ and change, so confirm what applies with your permit office. This page is general information, not legal advice.
JEBN Engineering LLC. We draft pool drawings for US permit submissions.
View state pages